Operating System : Window 7, MS office
Software : Civil engineering AUTOCAD. & Primavera P6. /8.2/17/21.
Extracurricular activities
• Develop master baseline construction schedule with cost and resource loaded using Primavera P6
Software
• Prepare overall plan (using Primavera) for execution & lease on detailed program, program preparation, resource allocation & monitor program duration and outputs, taking corrective actions with budgetary allowance.
• Understand WBS structure, and work within management and project maintenance team in the Development work breakdown structure for progress measurement, scheduling, cost estimating and project control.
• Coordinating and resolved long term and short term planning and scheduling problems with personnel throughout the Company and with contractor organizations. Acted as technical Consultant when required.
• Participated in analyzing change notices to estimate the impact on the completion of completion.
• Milestones with EOT analysis.
• Application of EVM in project progress calculations, invoicing calculations and forecasting
• Updating the Status of Drawings and the respective control sheet, procurement log status, S-curves to avoid delays for smooth execution of the project.
• Attending meetings with Client, Consultant, and Vendors & Contractors and preparing / updating reports and follow-up all the action points to smooth execution to achieve project target.
• Planning the EPC activities for the whole project i.e. Design, Equipment/Materials (PO, manufacturing, shipment and delivery), Civil works, Installation & Testing & commissioning.
• Activities are in line with the base line to reach the target date
• Regularly maintaining project programs for the Client / Internal including scenario analysis, resource planning, detailed planning of various project disciplines.
• S –curve, Histogram, WBS, critical path, cost & resource loading & manpower Calculation.
• To find the CPI and SPI value of the project.