Ispettore controllo qualità

Technip Energies - السعودية - الرياض

QC ELECTRICAL & INSTRUMENT INSPECTOR, SAUDI ARAMCO APPROVED

ONLY SAUDI CITIZEN CVS WILL BE EVALUATED

Responsible for conducting inspections and maintaining relevant documentation as records.

 Responsible for assuring required updated drawings are available and issued for construction.

 Responsible for assuring that the required RFI being raised are as per ITP.

 Regular surveillance and conduct inspection of construction activities as per ITP and project specification.

 Responsible for coordinating with engineering personnel regarding engineering drawing issues.

 Regular reporting to QC Supervisor & Manager, on any major issues which require immediate action.

 Inspection of TUTU (Topside Umbilical Termination Unit), SUTU (Subsea Umbilical Termination Unit) Cable/Tubing Installation.

 Witnessed the Stroke Test of Sub-Sea Hydraulic Operated Valve.

 Inspection of Hydraulic ESD System, Tubing Installation and Leak Testing.

 Responsible for Reviewing the Loop Folders.

 Inspection of RTU (Remote Terminal Unit), HIPS (High Integrated Protection System), ESD (Emergency Shutdown), HPU (Hydraulic Power Unit) Panels.

 Inspection of Field Junction Box Installation, Local Control Panels, Marshalling Box.

 Inspection of various Field Instruments Installation and to ensure that it is in accordance with Company Standards and Manufacturer’s Recommendations.

 Inspection of Cable Tray & Conduit Installation.

 Inspection of Cable Laying, Identification and Dressing.

 Inspection of Cable Gland and Sealing Installation

 Cable Continuity Insulation Resistance Testing and Termination.

 Witnessed Loop Check of various Field Instruments.

 Witnessed SAT of RTU (Remote Terminal Unit), HIPS (High Integrated Protection System), ESD (Emergency Shutdown), HPU (Hydraulic Power Unit) etc.

 Performed punch listing as per scope of work.

 Responsible for the verification and closing PMCC punch list items.

 Responsible for the lighting & receptacle installation inspection

 Responsible for witness of illumination level testing.

 Carried out Inspections for Motor Installation, witnessing Motor winding IR and winding low resistance test and Solo Run test.

 Inspecting Installation of Transformers, witnessing Transformer winding resistance & insulation resistance testing, Turns ratio test, phase verification tap changer, oil sampling & Vector group test.

 Performing quality inspections like material receiving, installation activities & pre- commissioning testing for the following electrical scope DC and AC power system, LV and MV Power Cables, Control Cables, LV and MV Control gears (MCC), Switchgears, LV and MV Motors, Power Transformers, LV Panels, ATS, Cable Bus, Cable tray system, Junction boxes, Switch racks, Conduits, Grounding and lightning protection, Lighting fixtures and lighting system.

 To witness & review the Cable Continuity & Megger Test/Hi-Pot Test.

 Coordinating with the management and contractor for achieving the target at specified time.

4

 Monitoring the progress of the Quality control departments & solving the issues related to inspection of the instruments.

 Responsible for the inspection of Fire Alarm System.

 Responsible for the installation inspection of Horn & Beacon, Manual Call Point, Deluge Valve Instruments, Gas Detector, Smoke Detector and other devices

 Responsible for witnessing Functional Test of Fire Alarm System.

 Responsible for coordinating with construction team in context to the rejected RFI’s and instructing them for re-raising the RFI after proper clarification and rectification.

 Responsible for the confirmation that the test equipment being used is calibrated by the third party and is accepted by the client.

 Responsible for tracking the record of overall calibrated instruments and the instruments need to be calibrated.

 Reviewed EPC contractor procedures, test reports, checklists, engineering drawings and attend owner-contractor weekly construction progress, QA/QC meeting and HSE surveillance and auditing.

 Developed inspection procedure as required. Ensure adequate design documentation and standards procedures are available for testing & construction. Ensure drawings are updated if there are changes.

 To ensure that verification and inspection activities are carried out as per approved Quality Plan standard and specification.

 Review the project quality plan, drawing, project standard and engineering specification ensure efficient execution of work.

 Ensure that all types of instruments shall be installed in accordance with manufacture`s instruction, the requirements of the standard and good practice.

 Prepare nonconformance reports (NCR) to the concerns and assist in developing corrective actions according to the approved quality plans, inspection test plans & relevant to client.

 Take immediate remedial to clear inspection logbook comments / pro-actives & close out the NCR's and relevant logbook entries after the implementation of the recommended corrective actions.

 Compliance with the site's health and safety regulations.

 Inspection of instrument duct bank, red tile and yellow tape installation for underground cables and backfilling.

 Inspection activities of impulse tubing installation as per Hook up & airline installation and witness for the leak test from root valve to instrument.

 Loop-checking for various instruments such as transmitter control valve, switches and others.

 Assist for vendor in commissioning activities.

 Termination of instrument control cables at marshalling, Junction Box and instrument side.

 Installation of fire alarm panel equipment heat detector pull down station switch, smoke detector, module and panel

 Consistent in quality work with a professional, dedicated and proactive attitude.

 Familiar with the International Industry Codes and Standards.

  •  Expertise in organization time management and scheduling, team building and leadership. Good communication skills, working with a team as well as independently. Strong technical background, hardworking and eager to acquire knowledge.

تاريخ النشر: 22 جمادى الثانية 1446 - اليوم
الناشر: LinkedIn
تاريخ النشر: 22 جمادى الثانية 1446 - اليوم
الناشر: LinkedIn