Planning & Scheduling Engineer

Saudi

Job Responsibilities:

  • Prepare and develop detailed project schedules using specialized planning software such as Primavera P6 and MS Project.
  • Monitor project progress regularly, compare actual performance with the approved baseline, and identify schedule variances.
  • Prepare weekly and monthly reports, including time analysis reports and performance progress reports.
  • Coordinate schedules with engineering, procurement, construction, and subcontractor teams to ensure alignment with the project plan.
  • Develop resource plans (manpower, equipment, materials) and ensure resource availability throughout the project stages.
  • Prepare S-Curves, Cash Flow, and Manpower Histograms to support planning and progress monitoring activities.
  • Manage change requests (Change Orders) and update the project schedule accordingly.
  • Review subcontractors’ schedules to ensure consistency with the main project schedule.
  • Participate in project meetings and present schedule status updates, challenges, and recommendations.
  • Assist in preparing and approving the project baseline schedule.




المهام الوظيفية:

  • إعداد وتطوير الجداول الزمنية التفصيلية باستخدام برامج التخطيط المتخصصة مثل Primavera P6 و MS Project.
  • متابعة تقدم الأعمال بشكل دوري ومقارنة الإنجاز الفعلي مع الخطة المعتمدة وتحديد الانحرافات.
  • إعداد التقارير الأسبوعية والشهرية بما في ذلك تقارير التحليل الزمني وتقارير الأداء.
  • تنسيق الجداول الزمنية مع فرق الهندسة، المشتريات، التنفيذ، والمقاولين لضمان توافقها مع خطة المشروع.
  • تطوير خطط الموارد (عمالة – معدات – مواد) وضمان توفرها حسب مراحل التنفيذ.
  • إعداد منحنيات S-Curve و Cash Flow و Manpower Histogram لدعم عمليات المتابعة.
  • إدارة طلبات التغيير (Change Orders) وتحديث الجدول الزمني وفق التعديلات المعتمدة.
  • مراجعة جداول المقاولين الفرعيين والتأكد من مواءمتها للجدول الرئيسي.
  • المشاركة في اجتماعات المشروع وعرض الحالة الزمنية والتحديات والحلول المقترحة.
  • المساهمة في إعداد واعتماد الخطة الزمنية baseline للمشروع.


Skills

Job Requirements:

  • Bachelor’s degree in Civil Engineering.
  • Minimum 10 years of experience in planning and scheduling within construction & infrastructure projects.
  • Preferred: Holding the Project Management Professional (PMP) and Scheduling Professional (PMI-SP) certifications from the Project Management Institute (PMI).
  • Proficiency in Primavera P6 (mandatory) and good knowledge of MS Project.
  • Understanding of project management standards and methodologies (PMI / PMP).
  • Experience in preparing and updating project schedules, delay analysis, and variance analysis.
  • Strong skills in preparing S-Curves, Cash Flow, and Resource Loading Plans.
  • Excellent command of Microsoft Office, especially Excel and PowerPoint.
  • Strong communication and reporting skills in both English and Arabic.
  • Ability to work under pressure and manage multiple tasks simultaneously.



متطلبات الوظيفة:

  • درجة البكالوريوس في الهندسة المدنية.
  • يفضّل حصول المتقدم على شهادة محترف إدارة المشاريع (PMP) وشهادة الجدولة الاحترافية (PMI-SP) من معهد إدارة المشاريع (PMI) المعتمد.
  • خبرة عملية لاتقل عن 10 سنوات في التخطيط والجدولة ضمن مشاريع الإنشاءات أو البنية التحتية .
  • إتقان برنامج Primavera P6 بشكل أساسي، ومعرفة جيدة بـ MS Project.
  • معرفة بمعايير وإجراءات إدارة المشاريع (PMI / PMP).
  • خبرة في إعداد وتحديث الجداول الزمنية وإصدار تقارير التأخير وتحليل الانحرافات.
  • القدرة على إعداد S-Curve, Cash Flow, Resource Loading Plans بشكل احترافي.
  • إجادة استخدام برامج Microsoft Office وخاصة Excel وPowerPoint.
  • مهارات قوية في التواصل وإعداد التقارير باللغتين العربية والإنجليزية.
  • القدرة على العمل تحت الضغط والتعامل مع أكثر من مهمة في نفس الوقت.
Post date: 11 Jumada al-thani 1447 - Today
Publisher: Bayt
Post date: 11 Jumada al-thani 1447 - Today
Publisher: Bayt